Tractor project of Rennes Metropole
Project Development and Management, 2014-2015
Irina Constant
24 / January /
8/9/2019 Irina Constantinescu La Courrouze
2/18
La Courrouze
Timeline
Project definitions
Table of decision making
Drivers of the project
Process
Project
Promoting
Conclusions
8/9/2019 Irina Constantinescu La Courrouze
3/18
8/9/2019 Irina Constantinescu La Courrouze
4/18
Project definitions:
- New infrastructure: Connect the area to Cleunay, Pilate and town Saint-Jacques-d
- New public transit: new station adjacent to metro station for train connections ‘Je
- Preserve the natural heritage of the area
“The planning policy of the state also changes its nature on the occasion, towith the decentralization policy. The state puts gradually the jurisdiction ofdevelopment in the hands of local authorities.”
8/9/2019 Irina Constantinescu La Courrouze
5/18
8/9/2019 Irina Constantinescu La Courrouze
6/18
2002 Public open call
Call for applications
Analyzes & Studies
Jan 2002 Open call competition submission,
Jury
Studio Secchi-Vigano (winner)
Mar 2002 Start contract
2007 Launch of the first phase of development
2008 Start the first construction
2009 &
2010 First deliveries of Real Estate
Dec 2014 End of 1st tranche
Timeline
8/9/2019 Irina Constantinescu La Courrouze
7/18
La Courrouze, Rennes, France
Decision making body:
• Vice president of Rennes Metropole
• President SEM (Mixt Economy Society ofthe Landscape and Equipment ofBretagne) – the 2 municipalities’representatives are involved
• Former Planning Assistant of Saint-Jacques-de-la-Lande.
• Director of project ownership of Rennes
•
Managing Vice President of the UrbanProspective Development
• Former Alderman
• Mayor of Rennes
• Former vicepresident of the Urban Travelthe Rennes Metropole
Not involved in decision makin
• l’ADEME (Agency for Environ
Energy Management)• The Cle (Council for the Loca
• Spokesman of Green Garden – selected by the majority ofof Rennes
• Inhabitants
• L’AUDIAR – Agency for Urban
Intercommunal DevelopmenFunding
• Rennes Metropole
• CDC (Caisse des Dépôts et
Consignations) program that
funds to invest in eco-quarte
2009
8/9/2019 Irina Constantinescu La Courrouze
8/18
Planning policy
- Historical tissue that be embedded in the concept
- Connecting the two municipalities
- Development of a new entrance in the city of Rennes
- Development of the public transit network
Design policy
- address the green building index
- Adapt to the metro transit ‘line B’
Guidelines
- The ’Green stream’ large open spaces with strong structure to urban spaceprivate spaces, semi-private and public gardens –more flexib
Participatory trajectory
- Workshops with inhabitants
- Workshops with Audiar (Agency for Urbanism and Intercommunal Development of R
- Workshops with planning experts to support management of future Jules Verde shar
developing the future Cleunay playground
8/9/2019 Irina Constantinescu La Courrouze
9/18
Proposed
infrastructure
8/9/2019 Irina Constantinescu La Courrouze
10/18
Proposed
Public
Transit
8/9/2019 Irina Constantinescu La Courrouze
11/18
1. Courrouze pole – co
services, transport
dwellings (4 to 7 floo
2. Woods Inhabited –
patios from April to May
3. Homes in the Woods
woods
4. Pole Mermoz – toget
an area of housing, offic
5. Pilate – houses in “b
homes, equipment and s
6. Dominos – offices, sh
7. Grande Prairie – in
dwellings into the opene
8. Les Terrasses de Lapublic spaces and pedes
9. The Gardenof Cleuna
10. Jules Verne. The va
park
11. Grand equipment. P
line terminus, allowing
develop because of the
Masterplan
8/9/2019 Irina Constantinescu La Courrouze
12/18
Adjacent
Project
8/9/2019 Irina Constantinescu La Courrouze
13/18
Life in the new neighbourhood
1st tranche
2006 and 2
2008: dest
abandoned
the future
Jules Verne
The Inhabit
"Casé Alté"560 units;
Homes in t
Dominos b
Germaine T
Pilate
2nd tranch
Pole Courro
The Garden
extension o
3rd installm
Les Terrass
Grande Pra
Pole Merma "large eq
Timeline
8/9/2019 Irina Constantinescu La Courrouze
14/18
... Related to citizensMarketing brochures
Press kit
Website
... Not focused on La Courrouze, but development of metropole
Agglomeration project
Platelet direction to economic development
Employment in region’s attractiveness
Communication materials:
to general public and metropole
8/9/2019 Irina Constantinescu La Courrouze
15/18
• The phasing agenda went hand in hand with the constraints of funding and vulnerab
succeeding
• Contributed to the dissemination of the Local Action Plan and other development s
• Phase one meant environmental, social and most important, economic fostering
Control and flexibility
8/9/2019 Irina Constantinescu La Courrouze
16/18
La Courrouze - Impact
Operation
• Construction of dwellings and homes• Construction of offices
• Adapt to the metro transit ‘line B’
Neighbourhood
• Inhabitants
•
Small businesses• Durability
• Green areas
Result overall
• Environment activists were involved iCDC – attracted funds
• Attractivity of infrastructure develothe city
Integrated the city into regional express
European Reference Framework
gave the possibility of developing aculture of local sustainable developmen
• the station of Rennes Metropoimproved in 2012
new services to host (hotels)
8/9/2019 Irina Constantinescu La Courrouze
17/18
Local Action Plan
Regional Express Network
La Courrouze in Rennes Metropole
A Project
Urban i
Ecologi
Controlle
PoliciesGuideli
8/9/2019 Irina Constantinescu La Courrouze
18/18
La Courrouze – Tractor project of Rennes Metropole
Agenda 21 Regional Integrated
Development Plan
-Mobility
Plan of
Rennes
-regional
express
network
Tractor of several
projects in thecity