  • 8/9/2019 Irina Constantinescu La Courrouze

    1/18

    Tractor project of Rennes Metropole

    Project Development and Management, 2014-2015

    Irina Constant

    24 / January /

  • 8/9/2019 Irina Constantinescu La Courrouze

    2/18

    La Courrouze

    Timeline

    Project definitions

    Table of decision making

    Drivers of the project

    Process

    Project

    Promoting

    Conclusions

  • 8/9/2019 Irina Constantinescu La Courrouze

    3/18

  • 8/9/2019 Irina Constantinescu La Courrouze

    4/18

    Project definitions:

    - New infrastructure: Connect the area to Cleunay, Pilate and town Saint-Jacques-d

    - New public transit: new station adjacent to metro station for train connections ‘Je

    - Preserve the natural heritage of the area

    “The planning policy of the state also changes its nature on the occasion, towith the decentralization policy. The state puts gradually the jurisdiction ofdevelopment in the hands of local authorities.”

  • 8/9/2019 Irina Constantinescu La Courrouze

    5/18

  • 8/9/2019 Irina Constantinescu La Courrouze

    6/18

    2002 Public open call

    Call for applications

     Analyzes & Studies

    Jan 2002 Open call competition submission,

    Jury

    Studio Secchi-Vigano (winner)

    Mar 2002 Start contract

    2007 Launch of the first phase of development

    2008 Start the first construction

    2009 &

    2010 First deliveries of Real Estate

    Dec 2014 End of 1st tranche

    Timeline

  • 8/9/2019 Irina Constantinescu La Courrouze

    7/18

    La Courrouze, Rennes, France

    Decision making body:

    • Vice president of Rennes Metropole

    • President SEM (Mixt Economy Society ofthe Landscape and Equipment ofBretagne) – the 2 municipalities’representatives are involved

    • Former Planning Assistant of Saint-Jacques-de-la-Lande.

    • Director of project ownership of Rennes

    Managing Vice President of the UrbanProspective Development

    • Former Alderman

    • Mayor of Rennes

    • Former vicepresident of the Urban Travelthe Rennes Metropole

    Not involved in decision makin

    • l’ADEME (Agency for Environ

    Energy Management)• The Cle (Council for the Loca

    • Spokesman of Green Garden – selected by the majority ofof Rennes

    • Inhabitants

    • L’AUDIAR – Agency for Urban

    Intercommunal DevelopmenFunding

    • Rennes Metropole

    • CDC (Caisse des Dépôts et

    Consignations) program that

    funds to invest in eco-quarte

    2009

  • 8/9/2019 Irina Constantinescu La Courrouze

    8/18

    Planning policy

    - Historical tissue that be embedded in the concept

    - Connecting the two municipalities

    - Development of a new entrance in the city of Rennes

    - Development of the public transit network

    Design policy

    - address the green building index

    - Adapt to the metro transit ‘line B’

    Guidelines

    - The ’Green stream’ large open spaces with strong structure to urban spaceprivate spaces, semi-private and public gardens –more flexib

    Participatory trajectory

    - Workshops with inhabitants

    - Workshops with Audiar (Agency for Urbanism and Intercommunal Development of R

    - Workshops with planning experts to support management of future Jules Verde shar

    developing the future Cleunay playground

  • 8/9/2019 Irina Constantinescu La Courrouze

    9/18

    Proposed

    infrastructure

  • 8/9/2019 Irina Constantinescu La Courrouze

    10/18

    Proposed

    Public

    Transit

  • 8/9/2019 Irina Constantinescu La Courrouze

    11/18

    1. Courrouze pole – co

    services, transport

    dwellings (4 to 7 floo

    2. Woods Inhabited  –

    patios from April to May

    3. Homes in the Woods 

    woods

    4. Pole Mermoz – toget

    an area of housing, offic

    5. Pilate  – houses in “b

    homes, equipment and s

    6. Dominos – offices, sh

    7. Grande Prairie  – in

    dwellings into the opene

    8. Les Terrasses de Lapublic spaces and pedes

    9. The Gardenof Cleuna

    10. Jules Verne. The va

    park

    11. Grand equipment. P

    line terminus, allowing

    develop because of the

    Masterplan

  • 8/9/2019 Irina Constantinescu La Courrouze

    12/18

    Adjacent

    Project

  • 8/9/2019 Irina Constantinescu La Courrouze

    13/18

    Life in the new neighbourhood

    1st tranche

    2006 and 2

    2008: dest

    abandoned

    the future

    Jules Verne

    The Inhabit

    "Casé Alté"560 units;

    Homes in t

    Dominos b

    Germaine T

    Pilate

    2nd tranch

    Pole Courro

    The Garden

    extension o

    3rd installm

    Les Terrass

    Grande Pra

    Pole Merma "large eq

    Timeline

  • 8/9/2019 Irina Constantinescu La Courrouze

    14/18

    ... Related to citizensMarketing brochures

    Press kit

    Website

    ... Not focused on La Courrouze, but development of metropole

    Agglomeration project

    Platelet direction to economic development

    Employment in region’s attractiveness

    Communication materials:

    to general public and metropole

  • 8/9/2019 Irina Constantinescu La Courrouze

    15/18

    • The phasing agenda went hand in hand with the constraints of funding and vulnerab

    succeeding

    • Contributed to the dissemination of the Local Action Plan and other development s

    • Phase one meant environmental, social and most important, economic fostering

    Control and flexibility

  • 8/9/2019 Irina Constantinescu La Courrouze

    16/18

    La Courrouze - Impact

    Operation

    • Construction of dwellings and homes• Construction of offices

    • Adapt to the metro transit ‘line B’

    Neighbourhood

    • Inhabitants

    Small businesses• Durability

    • Green areas

    Result overall

    • Environment activists were involved iCDC – attracted funds

    • Attractivity of infrastructure develothe city

    Integrated the city into regional express

    European Reference Framework

    gave the possibility of developing aculture of local sustainable developmen

    • the station of Rennes Metropoimproved in 2012

    new services to host (hotels)

  • 8/9/2019 Irina Constantinescu La Courrouze

    17/18

    Local Action Plan

    Regional Express Network

    La Courrouze in Rennes Metropole

    A Project

    Urban i

    Ecologi

    Controlle

    PoliciesGuideli

  • 8/9/2019 Irina Constantinescu La Courrouze

    18/18

    La Courrouze – Tractor project of Rennes Metropole

    Agenda 21 Regional Integrated

    Development Plan

    -Mobility

    Plan of

    Rennes

    -regional

    express

    network

    Tractor of several

    projects in thecity


Recommended